Who this is for
- Home builders clearing one lot at a time ahead of a foundation crew.
- Small developers opening a tract in phases and needing the same crew back each phase.
- Site contractors who would rather subcontract the understory (the brush and small trees under the canopy) than tie up their own equipment on it.
- Owner-builders preparing a homesite who want the clearing done before the grading contractor arrives.
What RRE does on a site
- Clear brush, vines, saplings and small trees across the building envelope, or across the whole lot, to the limits you flag.
- Keep marked trees standing, with the understory cleared around them so the site is readable.
- Grind or grub stumps inside the footprint and along the drive line.
- Open a temporary access path for the trades that follow.
- Leave the material ground in place as a mulch layer. No burn piles, no hauling.
RRE does not grade, excavate, build driveways, stabilize soil, install utilities or survey. Mulching does not make a site build-ready: RRE does not engineer or certify a building-ready surface. If the lot needs an engineered pad or a culvert, that is your excavation contractor's work; we clear so they can begin.
Scheduling and lead times
Send the lot address or parcel, the approximate acreage, the clearing limits, a few photos of the access, and the date your next trade is booked. We respond within one business day by email. Estimates are free and follow a site visit; the job is quoted by project, and a 25% deposit is required to schedule. Phased or repeat work is handled as maintenance visits, scheduled ahead or requested as needed. The earlier the clearing is on your schedule, the more likely the date holds.
Documentation
Builders and lenders usually ask for proof of insurance before a subcontractor is on site. RRE is insured. Certificates of insurance are available on request. Ask for what your file needs when you request the scope.
Handoffs
A clean handoff is the point of the job. Before we leave a site:
- The clearing limits match the flagged boundary, and anything outside it is untouched.
- Retained trees are standing with the understory cleared back so the grading contractor can see trunks and drip lines.
- Stumps inside the agreed area are ground or grubbed, so the pad area is ready to cut.
- The mulch layer is in place.
Tell us who follows us on site, and we will plan the finish around their first task.
CTA
Send the parcel, the limits and the date your next trade starts. Email hello@rreforestry.com or request a consultation.
Frequently asked questions
Can you clear only the house footprint and leave the rest wooded?
Yes. That is the most common request on a wooded lot. Flag the envelope and the drive, and we clear to the flags. The rest of the lot stays as it is.
What about the trees the plat says to protect?
Mark them. Selective clearing starts with identifying the trees to keep, and the understory is cleared around their trunks rather than through them. If the lot is in a jurisdiction with a tree ordinance, the owner confirms the rule with the town or county before we start.
Does the mulch layer get in the way of grading?
The ground material covers the soil and slows erosion while the lot waits. In the pad footprint your grader will strip it with the topsoil. If you need the footprint left cleaner, we can agree that finish in the scope.
Do you work from the civil plans?
Send what you have: the plat, the site plan, the flagged limits. The scope is written from the plan and the site visit, and the agreed boundary is settled before the approach is chosen.
Can you clear a whole subdivision phase?
Tell us the acreage, density and timing. Whether it fits, and which machine does the work, is judged at the site visit, and we will tell you plainly.