RRE Forestry & Plantation Management

Estimates

How estimates work

Estimates are free. Every one follows a site visit, and every one is quoted by project, never per acre or per hour. An RRE estimate is built from an agreed scope, not from acreage alone. We look at what you want cleared and kept, how dense the growth is, how a machine gets in, and what finish you want, and we price that.

Last reviewed October 2026Reviewer: pending

What we need from you

Four details are enough to start.

  1. The town or county and approximate acreage. This tells us where the property is and roughly how much ground is involved.
  2. What you want to clear, preserve or improve. The problem and the result you want. Name the trees or features you want kept.
  3. Photos of the area and the existing access. The overgrowth, the keepers, and the gate, drive or lane a machine would use.
  4. Your preferred timing.

Send them to hello@rreforestry.com or through the contact page. We reply within one business day by email. Photos and maps help start the conversation, but they never replace the site visit. How to prepare your property for an estimate has a short checklist.

How we scope

Scoping follows the three steps we use on every job: understand the property; define the work (scope, boundaries, finish); put the plan to work. The first two happen at the site visit.

Site visit. Every estimate requires one. We walk the property with you and talk through the areas to improve, the access available, and the trees or features to preserve. The equipment for the job is chosen here too.

Boundaries. We agree where the work starts and stops: the property line, a fence, a flagged line, the edge of a pond or a buffer. Nothing outside the agreed boundary is touched.

Keep list. The trees, features and areas to protect are agreed first, flagged on the ground and written into the scope. Selective clearing starts here.

Finish. We agree what the ground should look like when the machine leaves. That might be open ground with a mulch layer, stumps ground or grubbed, or lanes and lines cut to a given width.

Project quote. The quote describes all of the above so that you and RRE are pricing the same job. It is a single figure for the project.

What drives cost

No two properties price the same. Most of the land RRE quotes is private and varies tract by tract. According to the Georgia Forestry Commission's 2019-2023 Forest Inventory Analysis fact sheet, 91 percent of Georgia's timberland is privately owned, and Georgia ranks second in the nation in private timberland with about 21.4 million acres (source: Georgia Forestry Commission). According to the South Carolina Forestry Commission's 2020 Annual Report, South Carolina has 12.9 million acres of forestland, 87 percent of it privately owned, and the average family forest is 80 acres (source: South Carolina Forestry Commission). These are the things that move the number, in roughly the order they matter.

Driver Why it matters
Acreage More ground is more machine time, but acreage alone says little without the rest of this list.
Density Thin brush under the trees clears far faster than a wall of privet, smilax and wax myrtle.
Stem size Brush and saplings mulch quickly. Larger stems take longer. Where the limit falls is judged at the site visit; larger trees are kept or felled first by a logger.
Access A clear lane to the work area saves time. Tight gates, soft ground or a long run from the road add to it.
Stumps Mulching cuts to ground level. Grinding or grubbing stumps is separate work, priced by how many and how large.
Terrain Slopes, ditches, old fence wire and debris in the brush all slow the work.
Water Wet ground and high water tables limit where and when a machine can work, and buffers set where the work stops.
Disposal Mulched material stays on the ground. If you need material removed, a hauling contractor does that, and it changes the plan.
Distance RRE is based in Varnville, South Carolina. Distance to the property is one of the factors in the project quote. There is no published radius and no published travel-charge schedule.

Published national estimates vary widely, which is one reason RRE prices the scope rather than quoting by the acre or by the hour. See How much does forestry mulching cost? for the longer explanation.

What's included and not included

Included in an RRE estimate

  • The clearing or mulching described in the agreed scope, inside the agreed boundaries
  • Material ground in place and left as a mulch layer
  • Stump grinding or grubbing where it is listed in the scope
  • Attention to the keep list and the agreed finish

Not included

  • Hauling, burn piles or debris removal from the property
  • Grading, excavation, driveway building, soil stabilization or demolition
  • Dredging, pond construction or dam work
  • Utility installation or surveying
  • Herbicide or chemical treatment of regrowth (a licensed applicator does that)
  • Planting, seeding, discing, liming or soil amendment
  • Logging or removal of large timber worth selling (a logger does that first)
  • Permit applications, utility locates or boundary determination on the owner's behalf
  • Prescribed burning. RRE builds and maintains firebreaks. RRE does not conduct burns, obtain burn permits for clients, or act as burn manager.

If a job needs one of these, we will say so and point you toward the kind of contractor who does it.

How we invoice

The project quote is a single figure for the agreed scope. A 25% deposit is required to schedule the work. The remaining terms are set out in the written agreement for the job.

The estimate is for the scope it describes. If the scope changes once the work is under way, for example a larger area or stumps added, the change is agreed and priced before it is done.

Frequently asked questions

Why don't you publish a price per acre or per hour?

Because the acre is not the job, and neither is the hour. Two three-acre lots can differ several times over in density, stem size, access and stumps. Quoting the project keeps the estimate honest.

Is the estimate a contract?

No. An estimate describes the scope and the price for that scope. The work proceeds on the terms agreed in writing before it starts. See the Terms of service.

Can I reduce the cost?

Often, yes. Clearing a good access route first, settling the keep list before the visit, and leaving stumps where the finish allows all reduce machine time. Deciding early whether you really need material removed matters too, since hauling is separate work.

Do I have to pay a deposit?

Yes. A 25% deposit is required to schedule the work. The project quote and the written agreement set out the rest.

Do you charge for the estimate?

No. Estimates are free, and so is the site visit that every estimate requires.

Sources

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing