Site development, as RRE does it, is land preparation only. We clear the vegetation on a building site, protect the trees you are keeping, and open access so your builder and excavator can get in. RRE does not grade, excavate, stabilize soil, build driveways or certify a building-ready surface; those trades follow us. RRE prepares sites across Mid and South Georgia, plus the South Carolina Midlands and Lowcountry.

Last reviewed October 2026Reviewer: pending

What RRE does on a site

Clearing the footprint and the working area. Brush, vines and small trees are cleared from the house or barn footprint, the area your builder needs around it, and the route in. Most of it is mulched in place, which keeps the soil covered until the earthwork starts. Small trees go with the brush, up to a size judged at the site visit. Larger trees are decided one by one; those removed are felled first by a logger.

Opening access. A lane wide enough for the trades that follow is cleared from the road or drive to the site. Where the lane will become the driveway, we clear the vegetation along it and leave the surface for the driveway contractor.

Protecting the trees you keep. This is the part that matters most on a wooded lot. Before anything is cut, we walk the site with you and agree the keep list. That might be the live oak the house is sited around or the screen of pines along the property line. The keep list is flagged on the ground and written into the scope, and the clearing works around it.

Stumps. Within the footprint and anywhere a pad or slab will go, stumps are usually grubbed so the root mass is out. Elsewhere, grinding is often enough. We agree which goes where.

What happens next

When RRE finishes, the site is open ground with a mulch layer, the kept trees standing, the access lane clear, and the stumps handled as agreed. The next trades take it from there:

  • Grading, excavation and pad preparation. An excavation contractor cuts, fills and compacts. The mulch layer is stripped or worked by them as their plan requires.
  • Driveway construction. A driveway or site contractor builds the base and surface along the lane we cleared.
  • Utility installation. Your utility contractor trenches and sets lines. If a route needs vegetation cleared first, see utility clearing.
  • Surveying and layout. Your surveyor sets corners and building lines. If the lines are grown over, see survey clearing.
  • Soil stabilization and erosion control. The site contractor installs silt fence and stabilization where the permit requires it. Until then, the mulch layer is what covers the soil.

Sequencing with your builder

The order usually runs: survey and stake, clear, grade, utilities, build. A few points help in this part of the country:

  • Clear before the excavator is scheduled, not the same week. Clearing reveals the ground, and your builder may want to adjust the pad or the drive once they can see it.
  • Keep the big trees out of the compaction zone. Mature live oaks and pines are easily lost to root damage from grading and equipment traffic. Agree a protected zone around each kept tree with your builder, and have it fenced before earthwork starts.
  • Watch the water. High water tables and wet ground are common in the Lowcountry. We look at access and ground conditions when we scope. Timing the clearing around rain avoids rutting the lane you will need later.
  • Plan around the storm season. Hurricane season runs June through November. A cleared site that sits open through it is a site that drains and holds up better with the mulch layer left in place.
  • Confirm the tree ordinance before you clear. Several Lowcountry counties and towns regulate removal of protected and specimen trees, and buffers near water are regulated separately. Permits, utility locates and tree-protection compliance are the landowner's responsibility. Your builder or surveyor will usually know; check with the county if not. [FPO: RRE's permit policy and which approvals the owner must hold before work starts — VAL-041]

What does RRE's site clearing look like?

RRE's clearing under retained trees is shown in the woodland clearing project, where dense brush beneath mature trees became open ground between the kept trees. That is the finish a wooded building site gets before the excavator arrives. [FPO: location, date and approximate acreage for each project — DEP-28] [FPO: a site-preparation project with builder sign-off for this page — DEP-28]

Frequently asked questions

Can you grade the pad while you are there?

No. RRE clears vegetation and handles stumps. Grading, cut and fill, and pad preparation are done by an excavation contractor, and we will tell you when the site is ready for them.

Will the mulch layer be a problem for the excavator?

Usually not. The excavation contractor strips or works it as part of their site plan. If your builder prefers a particular finish, tell us when we scope the job and we will agree it before starting.

How close to the house footprint can you keep a tree?

That is a conversation between you, your builder and the tree. The closer a kept tree is to the pad, the more it depends on how the grading and foundation are done around its roots. We mark what you choose to keep; your builder confirms what the build can tolerate.

Do I need a permit to clear a building site?

Clearing on private rural land generally does not need a state permit, but counties and towns regulate protected-tree removal, and buffers and wetlands are regulated separately. Your building permit process will usually flag this. Confirm with the county, and read Do you need a permit to clear land in South Carolina or Georgia?.

Can you clear a site near a pond or creek?

Yes, with care. Buffers near water have their own rules, and the kept vegetation along a bank matters for erosion. Read Clearing near water: wetlands, buffers and ponds before you set the scope.

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing