RRE Forestry & Plantation Management

Trust and policies

Pricing policy

RRE Forestry & Plantation Management prices forestry mulching and land clearing in Georgia and South Carolina one way: a free site visit, then a single project quote. RRE does not quote per acre or per hour, and a 25% deposit schedules the work. Distance from RRE's base in Varnville, South Carolina is one factor in the quote; there is no published radius or travel schedule.

Last reviewed October 2026Reviewer: pending

Why does RRE quote by project instead of per acre or per hour?

Because an acre is not a unit of work. Compare an acre of light briars on dry sand with an acre of heavy sweetgum and privet on wet Lowcountry ground. They take different equipment, different passes, and different care around the keep list. A per-acre number hides those differences; an hourly rate shifts the risk of soft ground onto you.

A project quote fixes the scope instead. It names the work area, the agreed boundary, the keep list, and the intended finish, and prices that scope as one number. If the scope does not change, the price does not change.

Why is a site visit required?

Photos and maps help start the conversation, but they never replace the visit. From the road, a wall of wax myrtle and a wall of young pine look the same; up close they are different jobs. At the visit RRE walks the work area with you, checks density and stem sizes, looks for wet ground, stumps, wire, and buried lines, and chooses the machine.

RRE's process is the same every time: understand the property; define the work: scope, boundaries, finish; put the plan to work. The first two steps happen on the ground with you. Without them there is nothing to quote, which is why RRE will not give a number by email.

Why a 25% deposit?

A 25% deposit is required to schedule, and it is part of the quoted price, not an added fee. The remaining terms are written into your project quote, so you know them before you commit.

The deposit confirms that the scope on paper is the scope you want. It also lets RRE plan transport and the order of jobs across two states. It is taken once the scope is settled.

What is in the quote, and what is not?

In the project quote Not in the project quote
The work area and agreed boundary flagged at the site visit Hauling or dumpsters (vegetation stays as a mulch layer)
The keep list: trees, features, and areas to protect Burning or burn permits (a certified prescribed burn manager)
The intended finish: rough, medium, or fine Grading, excavation, or building pads (a grading contractor)
The services included: mulching, stump grinding, stump grubbing Herbicide (a licensed pesticide applicator)
The equipment RRE chose for the job Planting, seeding, discing, liming (a planting crew or forester)
A duration class: a partial day, one to two days, several days, or a multi-week phased project Permits, 811 locates, surveys, wetland delineation (the landowner)
Distance and access as priced Logging of merchantable timber (a logger or consulting forester)

If a quote leaves out something you expected, say so before you sign; adding a stump corridor is easier at the quote stage than once the machine is on site.

What changes a quote?

Density, stem size, finish, access, and ground:

  • Heavy density means more passes.
  • Larger stems slow the head and may need to be kept or felled first by a logger.
  • A fine finish takes more work than a rough one.
  • A soft spot that will not carry a tracked machine after rain can split the work into phases.
  • Stumps are a separate line because they need the stumper.

Rules change timing more than price. In South Carolina, as of October 2026, disturbing one acre or more needs SCDES Construction General Permit coverage before work begins. In Georgia, as of October 2026, projects under one acre are generally exempt unless within 200 feet of state waters or part of a larger common plan. RRE does not file for you, so the quote may note what must be in hand before scheduling.

The one honest limit is scope change. If you add work after the walk, the keep list grows, or a neighbor's line moves the boundary, the quote is revised rather than absorbed.

What does this mean for you?

You will not get a ballpark by email, and you should be wary of anyone who gives one from a photo. You will get a free visit, a written scope in plain English, one number for that scope, and a 25% deposit to put it on the calendar. Maintenance visits work the same way: scheduled ahead or requested as needed, quoted by project, with no preset tiers. Industry ranges on Forestry mulching cost are context, not RRE's rates.

Frequently asked questions

Can you give me a per-acre price?

No; RRE quotes by project, never per acre or per hour, because acreage says nothing about density, stem size, finish, access, or ground. Two ten-acre tracts in the same South Carolina county can be very different jobs. After a free site visit, you get one number for a written scope naming the work area, keep list, and intended finish. If the scope holds, the number holds.

Is there a travel charge?

There is no published travel charge or radius. RRE serves Mid and South Georgia and the South Carolina Midlands and Lowcountry from Varnville, South Carolina, and distance is one of the factors in the project quote. There is no separate mileage line; the number you get is the number for the whole job, where it is.

Does the deposit count toward the price?

Yes. The 25% deposit is part of the project quote, not an extra fee, and it is what puts the job on the schedule. The remaining terms are stated in your quote. If a permit, locate, or exemption letter is not yet in hand, the quote notes what has to be settled before the deposit is taken.

Sources
  • SCDES NPDES stormwater program (Construction General Permit): des.sc.gov
  • SCDES Less than 1 Acre of Land Disturbance: des.sc.gov
  • Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance: epd.georgia.gov

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing