What is RRE's permits policy?
A permit attaches to the land and the landowner, not the contractor. The policy has three parts:
- The rules that govern clearing on your land are yours to satisfy. RRE does not file permit applications, sign as your agent, or certify that a project is exempt.
- RRE asks the permit, locate, buffer, and tree-rule questions at the site visit, so you can answer them before a machine is on the trailer.
- The crew stops at anything the rules protect, such as a gopher tortoise burrow, a cavity tree, or a grave, until you and the agency have settled it.
Who is responsible for what?
| Item | You (the landowner) | RRE |
|---|---|---|
| Land-disturbance permit or exemption letter | Apply to SCDES (South Carolina) or the county Local Issuing Authority (Georgia) | Asks whether it is in hand; does not file |
| Utility locates (SC811 / Georgia 811) | Request the locate before stump work | Follows the contractor locate process; no stump work over unmarked lines |
| Stream, wetland, and marsh buffers | Know where they are; hire a wetland consultant if needed | Flags the agreed boundary at the buffer edge; never works in the water |
| Tree ordinances and specimen trees | Check the county or city rule; get a tree permit if required | Puts protected trees on the keep list; stays outside the protection zone |
| Easements and covenants | Read the terms | Clears only inside the agreed boundary |
| Protected species | Report finds to SCDNR or Georgia DNR | Stops, flags the feature, tells you that day |
| Property lines | Hire a surveyor if uncertain | Clears to the line you mark; does not determine boundaries |
How does the policy show up on a job?
At the site visit, RRE walks the work area with you and asks the questions in the table. The answers go into the written scope beside the keep list, the intended finish, and the agreed boundary. Anything unknown is noted as a condition of scheduling.
Stump grubbing and grinding break ground, so the locate comes first and the crew will not work where lines are unmarked. Mulching runs the head above the ground, but RRE still asks about wells, drain fields, and shallow lines. The operator may see a burrow apron (the fan of bare sand at a burrow mouth), an active cavity tree, a headstone, or old footings. If so, the machine stops, the spot is flagged, and you hear from RRE that day. At a tortoise burrow RRE keeps the 25-foot buffer USFWS practices set for temporary work (as of October 2026).
Which rules come up most often in Georgia and South Carolina?
South Carolina. As of October 2026, disturbing one acre or more by clearing, grubbing, grading, or excavating needs SCDES Construction General Permit coverage before work begins. Under one acre, you file the Notification Form for Sites Disturbing Less Than 1 Acre (Form 2628) and receive a letter of exemption first. A lot in a larger common plan of development needs a full Notice of Intent (NOI) at any size. In the Coastal Zone, work within half a mile of a receiving water body is covered even under one acre.
Georgia. As of October 2026, the state model ordinance treats clearing, grading, excavating, and filling as land-disturbing activity. Projects under one acre are exempt unless part of a larger common plan or within 200 feet of the bank of state waters. A 25-foot undisturbed buffer applies along state waters. Forestry practices are exempt, but if one disturbs a buffer, no other land disturbance except normal forest management is allowed on the whole property for three years.
Tree ordinances. In Beaufort County, South Carolina, live oak and other listed overstory trees are specimen trees at 16 inches trunk diameter at chest height (DBH) in the unincorporated county. The county's towns have their own rules (as of October 2026). See Beaufort County.
One honest limit: whether a mulching-only job counts as land disturbance varies by county and by how the work is done. RRE cannot promise an exemption; confirm with the county in Georgia or SCDES in South Carolina.
What does this mean for you?
Before the site visit, know:
- your acreage, and whether the parcel is part of a larger common plan
- where the water is
- whether a tree ordinance applies
- what any easement or covenant says
- whether a permit, an exemption letter, or an 811 locate is needed
The full list is on Who is responsible for what.
Frequently asked questions
Will RRE pull the permit for me?
No. RRE does not apply for permits, file notification forms, or sign as a landowner's agent in Georgia or South Carolina. The permit attaches to your land and to you. RRE tells you which agency to ask, writes what must be in hand into the scope, and holds scheduling until you confirm it.
Does forestry mulching need a land-disturbance permit?
It depends on the state, county, acreage, and whether the work breaks ground. In Georgia, clearing is land-disturbing activity under the model ordinance, with exemptions under one acre away from state waters and for forestry practices (as of October 2026). In South Carolina, one acre or more triggers the Construction General Permit. Confirm with your county before relying on an exemption.
What happens if the crew finds a gopher tortoise burrow?
The machine stops, the burrow is flagged, and you hear from RRE that day. Work near it does not resume until you have spoken with Georgia DNR or, in South Carolina, the SCDNR State Herpetologist. Capture or relocation requires a permit, and RRE does not handle tortoises.
Sources
- SCDES NPDES stormwater program (Construction General Permit): des.sc.gov
- SCDES Less than 1 Acre of Land Disturbance (Form 2628): des.sc.gov
- SCDES Stormwater Construction Activities (Coastal Zone): des.sc.gov
- Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance: epd.georgia.gov
- Beaufort County Planning Commission agenda quoting Sec. 5.11.100 (specimen trees): beaufortcountysc.gov
- USFWS Gopher Tortoise Best Management Practices: fws.gov
- Gopher Tortoise Council FAQ (reporting and permits in GA and SC): gophertortoisecouncil.org
- South Carolina 811: sc1pups.org
- Georgia 811: georgia811.com