Purpose
Most first messages leave out the details that decide the scope: how dense the growth is, whether there are stumps, where the wet ground is, and what has to stay. The planner collects them in one pass so the first reply from RRE is a real conversation about your property rather than a list of questions. Nothing here is a quote. It is the request that a quote starts from.
Inputs
Fields marked required must be filled before the request can be sent. Everything else is optional, and "not sure" is always an acceptable answer.
1. Where is the property? (required) Label: Town or county Help text: The nearest town or the county is enough. RRE is based in Varnville, South Carolina and works in Mid and South Georgia, plus the South Carolina Midlands and Lowcountry. Distance is one of the factors in a project quote. [FPO: county list and travel rules for the out-of-area message — VAL-039]
2. How much ground? (required) Label: Approximate acreage to work on Help text: A rough number is fine. If you are not sure, give the size of the whole parcel and describe the part you want cleared in the notes.
3. What is growing there? (required; choose all that apply) Label: Growth type Options: Grass and weeds · Briars, vines and brush · Saplings I can push through · Small trees I cannot push through · Larger trees mixed in · Stumps from earlier cutting · Not sure Help text: Pick everything you see. Vines tying the brush together are worth mentioning on their own.
4. How dense is it? (required) Label: Density Options: I can walk through it · I can get through with effort · I cannot get through it Help text: This matters more than acreage for how long the work takes.
5. What has to stay? (required) Label: Keep list Help text: Mature trees, particular species, a specific oak or palm, fence lines, a well head, a septic field, a creek bank, a view. Every property has something worth keeping. Tell us what yours is.
6. What do you want to do with the land afterward? (required; choose all that apply) Label: Goal Options: Usable yard or open space · A trail, lane or driveway route · Pasture or field edge · Prepare a building site · Hunting: shooting lanes or food plot site · Access around a pond · Firebreaks · Fence line · Invasive growth under control · Storm cleanup · Something else Help text: The goal tells us what the finish needs to be. "Prepare a building site" means we clear and grub the footprint.
7. How do we get in? (required) Label: Access Options: Truck and trailer can drive to the area · There is a gate or path but it is tight · The area is away from any road · Not sure Help text: Note gate widths, bridges, culverts, soft ground and anything a loaded trailer would have to cross.
8. What about stumps? Label: Stumps Options: Leave them cut low · Grind them · Grub them (full removal) · Not sure, recommend something Help text: Grinding suits mowing and trails. Grubbing is for areas that will be built on or disced.
9. Is there water on the property? (choose all that apply) Label: Water and wet ground Options: Pond · Creek or ditch · Ground that stays wet · Known wetland or buffer · None that I know of Help text: Wet ground changes which days we can work and how we approach the edge. Wetlands and buffers are regulated separately; we will not clear inside them.
10. When would you like it done? (required) Label: Timing Options: As soon as possible · Within the next three months · Later this year · Planning ahead, no date yet Help text: Hunting-season and planting-season work books earlier.
11. Photos (recommended) Label: Add photos of the area and the access Help text: Three to six photos help most: the growth from a few steps back, the access route, and anything you want kept. [FPO: upload limits and file types — DEP-29]
12. Anything else? Label: Notes Help text: Deadlines, neighbors, past work on the land, a surveyor's stakes, anything we should know.
13. How do we reach you? (required) Label: Name · Email · Phone (optional) · Preferred way to hear back (email or phone) Help text: RRE replies from hello@rreforestry.com.
Output
When you send the request, two things happen.
- Your answers are assembled into a structured request: location, acreage, growth, density, keep list, goal, access, stumps, water, timing, notes and photos. It is sent to RRE and a copy is sent to you.
- The copy is yours to keep. It is a useful record of what you asked for and the starting point for the scope conversation.
Your photos travel with the request. [FPO: photo delivery route once the tool is built, and whether photos are attached or linked — DEP-29]
Confirmation message, shown on screen and in the email copy:
Your request is on its way to RRE. We have sent a copy to the email you gave us. We will read through your answers and photos and reply by email within one business day with a few follow-up questions or a proposed time for a site visit. If you do not hear from us within one business day, email hello@rreforestry.com and mention the town or county you entered.
Interim route, until the form build is complete: the "Send my request" button opens an email to hello@rreforestry.com. The questions above are pre-filled as headings for you to answer. [FPO: confirm the interim mailto route and its subject line — DEP-24]
Assumptions
The planner makes a few assumptions so you do not have to.
- Acreage is approximate. Density and stem size change the scope more than a few acres either way.
- The keep list is a starting point. It is confirmed on site before any work begins.
- "Prepare a building site" is land preparation only. Grading, excavation, driveways and utilities are other contractors' work.
- Stump answers are a preference, not a decision. RRE may recommend a different approach once the stumps are seen.
- Wet ground and water answers are used to plan the approach. Permits and buffers are confirmed with your county and the relevant agencies, not by this tool.
- Nothing in the planner is a price. Pricing is never shown on this site. Estimates are free, follow a site visit, and are quoted by project.
What happens next
- RRE reads the request and the photos.
- You get a reply by email within one business day, with any questions the request did not answer and a proposed time for a site visit.
- At the site visit the scope is agreed: what comes out, what stays, the agreed boundary and the intended finish. The keep list is flagged on the ground and written into the scope.
- You receive a project quote based on that scope. A 25% deposit is required to schedule. See How estimates work.
Send my request
Finish the fields above and send. If you would rather write it in your own words, email hello@rreforestry.com. Include the town, the acreage, what you want cleared and kept, a few photos and your timing. Send my request [FPO: replace with form submit action — DEP-24]
Frequently asked questions
Do I need to know what services I want?
No. Tell us what is getting in the way and how you want to use the land. The goal and growth answers point to the work; we will name it in the reply.
What if I do not know the acreage?
Give your best guess or the parcel size from your tax record and describe the part you want cleared. Photos usually fill in the rest.
Is this a quote?
No. It is a request. An estimate follows a conversation and a site visit. Photos and maps help start the conversation but never replace the visit.
What happens to my photos and details?
They are used to understand your project and reply to you. [FPO: privacy and data-handling statement for form submissions — DEP-24]
Can I send the request without photos?
Yes. Photos are recommended because they shorten the back-and-forth, but the request works without them.