What should the contractor do before quoting?
Walk the property with you. A quote given from the road, from a satellite image, or from an emailed acreage figure is a guess about the two things that drive the work: how dense the growth is and how hard it is to get a machine to it. Photos and maps are useful for starting the conversation; they are not a substitute for standing in the brush.
On the walk, a good contractor asks how you intend to use the ground afterward, because the finish follows from the use. "Open enough to walk" and "ready to mow" are different jobs. They also ask what you want kept, and they mark it. If a contractor does not raise the keep list, raise it yourself.
RRE's practice: every estimate is free and follows a site visit, and the keep list is flagged on the ground and written into the scope before any machine arrives.
What should be in the written scope?
A one-line quote is not a scope. Before you accept any proposal, it should state:
- The boundaries of the work, by description or a marked map.
- What is kept: species, size, or specific marked trees, and any features such as fence lines, wells, or drains.
- The finish: whether the ground will be walkable, mowable, or build-ready, and whether stumps are cut low, ground below grade, or grubbed out.
- What happens to the material: left as mulch, piled, or hauled, and by whom.
- Anything excluded, with a note on who does it.
- How the price is structured and when payment is due.
If any of those is missing, ask for it in writing. A contractor who resists writing the finish down is leaving the argument for later.
How should a land clearing job be priced?
You will meet three structures: by the hour, by the acre, and by the project. Hourly pricing moves every risk to you, because the slower the machine goes, the more you pay. Per-acre pricing sounds simple and is the most misleading, because a dense two-acre thicket with no access can be more work than ten open acres; the page on what drives the cost of forestry mulching explains why. A project quote puts the risk with the contractor, who has walked the ground and should know what it will take.
Whatever the structure, the quote should say what it includes. Travel, setup, stump work, and the finish are the items most often left out and added later.
RRE's practice: one quote for the whole project after the site visit, never by the hour or the acre. A 25% deposit schedules the work. RRE does not publish rates.
What insurance should you ask for?
Ask for a certificate of insurance before the work is scheduled, sent to you directly. It should show general liability coverage in force and, where the contractor has employees, workers' compensation. Read the dates. If a contractor hesitates, cannot produce it, or offers a photograph of an old card, treat that as the answer.
RRE's practice: RRE is insured, and certificates of insurance are provided on request.
What should a contractor tell you they do not do?
The clearest sign of a contractor who knows the work is a clear list of what they will not touch. Land clearing borders on several trades with their own rules and licences: burning and burn permits, herbicide application (a licensed applicator in both states), grading and excavation, hauling, work in water or along wetland edges, surveying, logging, and tree work near structures. A contractor who says yes to everything is either subcontracting without telling you or planning to improvise.
Ask directly: "What on my list will you not do, and who should do it?"
RRE's practice: RRE clears and mulches vegetation and grinds or grubs stumps. RRE does not burn or obtain burn permits, apply herbicide, grade or excavate, haul material, build driveways, work in water, plant, survey, log, do arborist work, or file permit applications. Where a project needs those, RRE says so and you bring in the right contractor.
What should you ask about the equipment?
You do not need to know machine models. You need three answers:
- Is it tracked, and how does it handle soft ground? In the Lowcountry and along bottomland, wheeled machines rut and bog; tracked machines spread the weight.
- What size of stem can it take down, and what happens to larger trees? Forestry mulchers have a practical limit; above it, trees are felled first or left.
- How does the operator protect the root zones of the trees on the keep list? Repeated passes over the same roots compact soil, and a good operator limits them.
RRE's practice: RRE runs tracked, high-flow mulching machines and a stump grinder. The equipment page covers what they can and cannot do.
What rules apply, and who checks them?
Clearing itself rarely needs a permit in rural Georgia or South Carolina, but the edges of a job often touch rules: county ordinances on land disturbance, forestry best management practices along streams, wetland buffers, and utility locates before any digging. Both states run a free locate service (Georgia 811 and SC 811) that must be called before stumps are grubbed or trenches cut. Ask the contractor which rules they think apply to your land, and whether they or you make the calls. A contractor who says "there are no rules" has not looked.
Sources worth reading before you hire anyone are listed at the end of this page.
What are the warning signs?
A quote without a site visit. A price per acre with no mention of density or access. No written keep list. No certificate of insurance. A promise that nothing will grow back. A full payment demanded up front. Vague answers about what happens to the material. Any of these is reason to keep looking.
A short checklist
Before you sign, you should be able to tick every line:
- The contractor walked the land with me.
- The keep list is marked on the ground and in the scope.
- The finish is described in words I understand.
- The scope says what is excluded and who does it.
- The quote is for the whole project, with travel and setup included.
- I have a certificate of insurance with current dates.
- I know which rules apply and who makes the utility locate call.
- I know what will grow back and what maintenance looks like.
Frequently asked questions
Should I get more than one quote?
Yes, and compare scopes rather than totals. Two quotes with different finishes, different stump handling, or different exclusions are not the same job at different prices. Ask each contractor to describe the finish in the same terms so you can compare like with like.
Is the cheapest contractor usually a mistake?
Not always, but a quote far below the others usually means something is missing: a site visit, stump work, travel, insurance, or the finish you asked for. Ask what it excludes before you decide.
Do I need to be there for the site visit?
It helps. The keep list and the finish are decisions only you can make, and they are easiest to make standing in front of the trees. If you cannot attend, mark what you want kept with tape or paint and send photos.
Can one contractor do everything on my list?
Rarely. Clearing, burning, herbicide, grading, hauling, and planting are different trades with different licences. A good contractor tells you which parts are theirs and who handles the rest. RRE does the clearing, mulching, and stump work and names the rest.
What if the contractor damages a tree I wanted kept?
This is why the keep list is written into the scope. Walk the job with the contractor at the end, compare it with the scope, and raise anything missing before the final payment. Ask before the work starts how they handle a mistake.
Sources
- Georgia Forestry Commission, forestry best management practices and landowner services (source: Georgia Forestry Commission)
- South Carolina Forestry Commission, best management practices for forestry (source: South Carolina Forestry Commission)
- Georgia 811, utility locate requests before digging (source: Georgia 811)
- SC 811, utility locate requests before digging (source: SC 811)