RRE Forestry & Plantation Management

How the work happens

Working near water edges

The machine goes as close to the bank as the agreed line allows. That line is set at the site visit from three things: any buffer the law requires, how soft the bank is, and what you want the edge to look like. RRE Forestry & Plantation Management works pond, creek, and ditch edges in Georgia and South Carolina from dry ground only, never in the water.

Last reviewed October 2026Reviewer: pending

What sets the line at the water?

Three things, and the most restrictive one wins.

The rule. In Georgia, a 25-foot undisturbed buffer applies along the banks of state waters under the Erosion and Sedimentation Act. A project under 1 acre is normally exempt from a land-disturbance permit. It loses that exemption if it sits within 200 feet of the bank of state waters (as of October 2026, epd.georgia.gov). In South Carolina, clearing or grubbing that disturbs 1 acre or more needs Construction General Permit coverage. In the Coastal Zone, construction within half a mile of a receiving water body falls under the stormwater program even under 1 acre (as of October 2026, des.sc.gov). Whether forestry mulching that leaves the roots and the mulch layer in place counts as land disturbance is a question for the agency and your county. Confirm it before the work rather than assume.

The ground. A pond bank or creek edge in the Coastal Plain is often firm on top and soft underneath. A tracked machine spreads its weight well, but a soaked bank can still slump under it. A slumped bank puts mud in the water, which is the thing every buffer rule exists to prevent.

Your intent. Some owners want a mowable edge to the water; others want a screen of willow and wax myrtle left on the far side for ducks and shade. That is a keep-list decision, and it moves the line too.

In short: the agreed boundary at the water is a flagged line on dry ground, set at the site visit, and the machine does not cross it.

How does the operator work an edge?

  1. Walk the bank at the site visit. The operator walks the water's edge with you and probes the soft ground. The signs that a bank will not hold are a sagging lip, seeps, cattails well up the slope, or a line of cypress knees.
  2. Flag the line. The agreed boundary is flagged on the ground as a line parallel to the water. It sits far enough back to satisfy the rule, the ground, and your keep list. Where a buffer rule applies, the buffer line is the minimum and the flagged line is at or outside it.
  3. Work parallel, head toward the water. The machine runs along the flagged line rather than nosing down the bank. The head can reach out over brush closer to the water than the tracks go. So the cut edge is usually a little past the track line and still on dry ground.
  4. Leave the mulch layer. Ground-up brush stays where it falls, which helps hold the bank through the first rains. Nothing is pushed into the water or piled on the bank.
  5. Stop where the ground says to. If the bank is softer than it looked at the site visit, the operator pulls the line back and tells you. That is the one change to the agreed boundary made without a conversation first. The alternative is a machine in the pond.

Pond-edge reclamation as a service is vegetation and access only, on dry ground. It opens the edge so you can reach the water; it does not change the pond.

What does this mean for your project?

Expect the edge to be cleared from the land side and to stop short of the water. On a closed-in farm pond, the willow, privet, and wax myrtle on the bank are usually mulched to a line. The last few feet of bank are left or hand-cleared, and the pond itself is untouched.

Expect a conversation about the rule before the machine comes. In Georgia the 25-foot buffer is yours to respect, and the county's Local Issuing Authority confirms whether your project needs a permit. In South Carolina the question is whether your work triggers the stormwater program. That depends on acreage, location, and whether the work counts as land disturbance. RRE does not file permit applications for you and does not decide where a wetland begins. A wetland consultant maps wetlands, and the Army Corps of Engineers regulates them.

And expect limits on what "reclaim the pond" can mean. RRE opens the edge; it does not rebuild the pond.

What are the limits?

RRE does not work in water, on a bank too soft to hold the machine, or inside a required buffer. It does not dredge, remove silt, repair a dam, deepen a pond, or clear a spillway of anything but brush on dry ground. Those are a pond consultant's or excavation contractor's jobs. It does not treat water-edge invasives such as alligator weed with herbicide; a licensed pesticide applicator does that work.

The tradeoff is that an edge cleared from dry ground is not a clean edge to the waterline. There is usually a strip of the softest bank that is left as it was or hand-cut later. A brushy pond edge in the Lowcountry can close back in within a few seasons. The mulch layer slows regrowth, and a maintenance visit scheduled ahead or requested as needed keeps the edge open.

Frequently asked questions

Will the machine go into the pond or creek?

No. RRE works from dry ground only and never puts the machine in the water or on a bank that will not hold it. The cutting head can reach a little past where the tracks go, so brush close to the water can be cut while the machine stays back on the flagged line. Anything in the water, including silt, stumps below the waterline, and the dam itself, is a pond consultant's or excavation contractor's job.

How far back from the water do you stay?

It depends on the rule, the ground, and your keep list. In Georgia a 25-foot undisturbed buffer applies along state waters; in South Carolina the Coastal Zone stormwater rules reach half a mile from a receiving water body. Beyond the rule, the operator probes the bank at the site visit and sets the flagged line where the ground will hold the machine. The line is written into the scope.

Does mulching near a creek need a permit?

Possibly: in Georgia, work within 200 feet of the bank of state waters loses the under-1-acre exemption, and the county's Local Issuing Authority decides what applies. In South Carolina, acreage, location, and whether the work counts as land disturbance all matter. Permits are the landowner's responsibility; RRE does not apply for them. Confirm the current rule with your county and with Georgia EPD or SCDES before the site visit.

Can you clear the cattails and alligator weed at the edge?

Cattails, alligator weed, and phragmites grow in the wet zone, and RRE does not work in water or apply herbicide. What RRE can do is mulch the willow, privet, and wax myrtle on the dry bank so you can reach the water. For plants in the water, a licensed pesticide applicator or a pond consultant is the right call.

Sources
  • Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance (25-foot buffer; 200-foot rule for under-1-acre projects; definition of land-disturbing activity): epd.georgia.gov
  • SCDES Stormwater Construction Activities (1-acre threshold; Coastal Zone half-mile rule): des.sc.gov
  • SCDES NPDES stormwater program (Construction General Permit): des.sc.gov

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing