What makes a slope workable?
Four things, judged on the ground: the steepness, the direction the machine can run, the firmness of the soil, and what is at the bottom. A gentle sand ridge in the South Carolina Sandhills is one problem. A red clay road cut on the Mid Georgia fall line, or a canal bank in the Lowcountry with water at the toe, is another.
The rule is that a tracked machine is far more stable running straight up and down a slope than running across it. Working across a slope loads the downhill track, tips the machine, and lets the head pull it sideways. Working up and down keeps the weight centered and lets the operator back off if the ground moves.
Soil matters as much as angle. Dry sand holds a track; wet sand runs. Clay that is firm in October can be greasy after a February rain. A slope that was fine at the site visit may not be fine on the morning of the work, and the operator checks it again before the first pass.
How does the operator run a slope or ditch?
- Walk it first. At the site visit the operator walks the slope or ditch and looks at the soil, the top, and the bottom. The walk also turns up anything hidden in the brush, such as an old culvert, a washout, or a fence.
- Pick the direction and the entry. The plan sets where the machine enters the slope, which way it runs, and where it turns. Turns are always on the flattest ground available, never mid-slope.
- Reach with the head. On the steepest section, the machine stays on the gentler ground above and reaches the brush with the head. On a ditch, that usually means the tracks stay on the top of the bank and the head works down the side. The ditch bottom is not driven.
- Keep the finish coarser on the slope. The intended finish on a slope is rougher than on flat ground. The head is kept off the soil so it does not cut into the surface and start a gully. Roots and the mulch layer stay in place.
- Stop at the agreed boundary. On a ditch bank or stream bank, the flagged line stays back from the water. In Georgia a 25-foot undisturbed buffer applies along state waters. Clearing within it, or within 200 feet of the bank, changes what permit rules apply (as of October 2026, epd.georgia.gov). Whether a particular ditch counts as state waters is a question for the county's Local Issuing Authority, not something RRE decides.
Ground-up brush stays on the slope as a mulch layer. On a bank, that layer is doing real work. It breaks the fall of rain, slows runoff, and keeps the soil covered while the roots underneath keep holding it.
What does this mean for your project?
Expect the operator to say no to some ground. A slope that is too steep, too wet, or too undercut to run safely is left, worked from the top with the head only, or left for a hand crew. That is a scope decision made with you at the site visit and written into the project quote. The quote reflects the ground that will actually be worked.
Expect the finish to vary with the slope. The flat ground above a bank can be mulched to a finer finish. The bank itself is left coarser, with the mulch layer thicker and more stems left standing. If you want a clean, mowable slope, that is often a two-step job. Mulch now, let the mulch layer settle, and come back with a maintenance visit once the ground has held through a season of rain.
Ditches along a public road are a separate question. The road right-of-way and the ditch itself usually belong to the county or the state, and clearing inside it is their call. Confirm with your county public works or the state DOT district office before the site visit. In a drainage district, the ditch may be the district's.
What are the limits?
RRE does not publish a maximum slope angle. The safe limit changes with soil, moisture, direction, and what is at the bottom, and the operator decides it on the ground. If you need a stated slope rating for a specification or a bid package, ask at the site visit. The operator can tell you what the machine will and will not do on your ground.
Mulching does not stop erosion. It leaves the slope better protected than a dozer or a root rake would, because the roots stay and the surface is covered. But a steep, freshly cleared bank in a Coastal Plain downpour can still move. Where a slope needs engineered stabilization, matting, or grading, that is an excavation or grading contractor's work with a plan from an engineer. Where a slope is inside a required buffer, it is left.
RRE also does not work in water, which on a ditch means the bottom and the wet toe of the bank are not driven or cut. RRE does not dig, clean, reshape, or deepen ditches; that is an excavation contractor's work. Brush in the ditch bottom that the head cannot reach from the top of the bank is left or hand-cut.
Frequently asked questions
What is the steepest slope you will work?
RRE does not publish a maximum angle. The safe limit depends on the soil, how wet it is, whether the machine can run straight up and down, and what is at the bottom. The operator sets it on the ground at the site visit and checks it again on the morning of the work. Ground that cannot be run safely is worked from above with the head or left.
Will mulching a slope cause erosion?
Less than bare ground would. Mulching leaves the roots in place and covers the surface with a mulch layer, which slows runoff and protects the soil through the first rains. It does not make a steep bank stable, and a freshly cleared slope in a heavy Coastal Plain storm can still move. Engineered stabilization, matting, or regrading is an excavation or grading contractor's work.
Can you clear a drainage ditch?
RRE can mulch the brush on a ditch bank from the top of the bank, with the head reaching down the side. RRE does not drive the ditch bottom, work in water, or dig, clean, reshape, or deepen a ditch; that is an excavation contractor's work. A ditch along a public road or in a drainage district may belong to the county, the state, or the district. Confirm ownership before the site visit.
Will you work a slope after it rains?
Usually not until it has dried. Wet sand runs and wet clay is greasy, and both make a slope that was fine at the site visit unsafe for the machine. The operator checks the ground on the morning of the work and may move the slope to a later day while flatter sections are worked first.
Sources
- Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance (25-foot buffer along state waters; 200-foot rule; definition of land-disturbing activity): epd.georgia.gov