What is the short version?
By the time the trailer pulls in, the decisions have been made. The site visit set the keep list, the boundaries, and the intended finish, and the scope wrote them down. The work day executes that scope; if something on the ground does not match it, the operator stops and calls you rather than guessing.
What happens from arrival to wrap-up?
- Arrival and unloading. The machine arrives on a trailer and is unloaded at the access point agreed at the site visit. That is usually a gate or a firm pull-off where the trailer can turn. If you have animals, the gate stays closed until they are secured.
- The walk. Before the machine starts, the operator walks the work area again. Ground changes between the site visit and the work day, especially in the Lowcountry after rain. The walk confirms where the machine can go and looks for anything new: a burrow, a cavity tree, a grave marker, wire, or a flag from the 811 locate.
- The flagging check. The keep list was flagged on the ground at the site visit. The operator checks that every flag is still in place and matches the scope, and that the agreed boundary is marked. Any flag that has blown down is replaced before cutting starts. This is the last chance to catch a tree that should be on the keep list and is not.
- The work. The mulcher works the areas in the order the operator planned. Processed material is spread as a mulch layer where it falls, and passes are repeated as the intended finish for each area requires. People, pets, and vehicles stay out of the work area while the head is running.
- The wrap-up. The head is lowered, the machine is shut down and secured, and debris is cleared from the engine compartment and screens. On a multi-day project the machine usually stays on site; when the scope is complete, the operator sends you a short note and the final walk-through is scheduled.
What it means for you
You do not need to be present during the work, but you do need to be reachable by phone or email in case the ground does not match the scope. An answer within the day keeps the machine from sitting idle. If you are present, the useful times are the flagging check at the start and the final walk-through at the end.
Before the day, three things fall to you:
- The 811 locate request is filed and the ticket is valid. Private lines the public locate does not mark, such as the run from the meter to the house, the well, or the septic field, are flagged or shown to the operator.
- The gate is unlocked or the code is shared.
- Animals are penned, and anyone on the property knows the work area is off limits while the machine runs.
What a work day does not include
A work day is mulching or stump work inside the agreed boundary and nothing else. The operator will not clear beyond the boundary because a neighbor asks, take a flagged tree off the keep list, or add stump work that was not scoped. Changes are made with you by email or phone and added to the scope, not improvised.
A work day also does not include grading, hauling, burning, or spraying; nothing leaves the property and the material stays as a mulch layer. If the day reveals a need for something RRE does not do, the operator stops and tells you who to call. That might be a grading contractor for a building pad, a licensed pesticide applicator for cut-stump treatment, or a wetland consultant for an uncertain line.
Weather can end a day early. RRE will not run a tracked machine across saturated ground to finish on schedule, because the ruts cost more than the lost time. In hurricane season, June through November, a South Georgia storm cell can stop work, and the operator will tell you how the schedule shifts.
Frequently asked questions
Do I need to be there while the work is done?
No. The decisions were made at the site visit and written into the scope, and the operator works to that scope. What matters is that you can be reached by phone or email during the day in case the ground does not match the plan. If you want to be present, the two useful moments are the flagging check before the machine starts and the final walk-through when the project is complete.
What should I do before the crew arrives?
File the 811 locate request so the ticket is valid for the work day, and show or flag any private lines the public locate does not mark. Unlock the gate or share the code, pen your animals, and tell anyone on the property that the work area is off limits while the machine runs. Move stands, cameras, feeders, and anything else you want kept out of the work area.
What if you find something unexpected?
The operator stops. A burrow, a cavity tree, a grave, buried wire, an old structure, or a wet area that was not wet at the site visit all stop the machine at that point. The operator calls or emails you, explains what was found, and agrees how to work around it or who to call. Protected features are the landowner's responsibility to resolve; RRE's job is to stop and tell you.
Sources
- South Carolina 811 (locate requests before digging): sc1pups.org
- Georgia 811 (locate requests before digging): georgia811.com
- NOAA National Hurricane Center (Atlantic hurricane season June 1 – November 30): nhc.noaa.gov