Who this is for
- Utility contractors who need a corridor opened or re-cleared before line work or inspection.
- Survey crews that need a sight line cut through brush, privet and vines to run a boundary or a traverse.
- Engineering firms doing field work on a wooded parcel who need access to test locations, control points and wetland flags.
- Project managers who want one crew for the vegetation and a clean handoff to the crew that follows.
Route and line clearing scope
- Clear brush, vines, saplings and small trees along a staked or GPS-defined line, to the width you specify.
- Re-clear existing rights-of-way where the understory (the brush and small trees under the canopy) has closed in.
- Open access paths to pole locations, test sites or monuments so people and equipment can reach them.
- Keep flagged trees, monuments, pins and witness markers untouched; the line goes around them.
- Leave the ground material as a mulch layer. No piles, no burning, no hauling.
Larger trees in the corridor are kept or felled first by a logger; the limit is judged at the site visit and written into the scope. Stumps along the line are ground or grubbed separately when the plan calls for it. RRE does not set poles, trench, install utilities, grade or survey; those stay with your crews.
Coordination and locates
Send the route in whatever form you have: a staked line, a KMZ, a drawing with widths, or a set of corner pins. We walk it with you at the site visit, agree the work area, the limits and the intended finish, and then schedule. Estimates are free and quoted by project.
Mulching works above ground. Stump grubbing disturbs the soil, so utility locates (SC811 or Georgia 811) are requested before that work begins. Locates are the property owner's responsibility; RRE follows the contractor locate process where it applies, and stops work if it finds a burrow, cavity tree, grave or other protected feature. If the corridor crosses a wetland flag or a buffer, tell us. Those areas are regulated separately, and the limits stop at the flag unless your permit says otherwise.
Documentation
Firms usually need proof of insurance and sometimes a safety record before a subcontractor works under their name. RRE is insured. Certificates of insurance are available on request. Tell us what your contract requires when you send the route.
CTA
Send the route, the width and the date your crew needs it open. Email hello@rreforestry.com or request a consultation.
Frequently asked questions
How narrow a line can you cut?
Tell us the width you need and we will say how it is best done. A survey sight line is a different job from a maintained right-of-way; the scope is written for the one you need. Which of RRE's two tracked mulching machines fits the width, and what the growth allows, is judged at the site visit.
Will you disturb our pins and monuments?
Not if we know where they are. Flag them or send coordinates, and the line is cut around them. If a pin is buried in brush and we find it, we stop and mark it.
Can you work on a corridor that is partly wet?
Wet ground and high water tables are common in the Lowcountry. Tell us the conditions and the season, and we will say what can be reached without rutting. Work inside a flagged wetland or buffer waits on your permit.
Do you clear for pipeline or transmission projects?
The scope is the same: a defined corridor, a width, retained features, a finish. Send the route length, width and terrain; whether it fits is judged at the site visit.