RRE Forestry & Plantation Management

Trust and policies

Water-edge policy

RRE Forestry & Plantation Management works pond banks, creek edges, and ditch banks in Georgia and South Carolina on dry ground only. It works up to an agreed boundary set at the site visit, outside any buffer the law or your plan requires. RRE never works in the water, below the waterline, or on saturated ground that tracks would rut. The bank's root systems stay in place.

Last reviewed October 2026Reviewer: pending

How close to water will RRE work?

As close as three things allow:

  1. The ground. A tracked machine works on firm soil. Where the bank turns soft, the operator stops, because rutting a bank does more harm than the brush did.
  2. The law. The state buffers and local rules below set the second limit.
  3. Your keep list. The shade trees, fishing spots, and dock approach you want left alone set the third.

Within those limits, RRE mulches the brush, saplings, and vines that have closed a pond bank or creek edge and opens access paths to the water.

Why does the water edge get its own policy?

Because the rules change at the water, and a clearing mistake there is hardest to undo. In Georgia, the state erosion and sedimentation law keeps a 25-foot undisturbed buffer along state waters. A project under 1 acre loses its exemption if it is within 200 feet of the bank of state waters (as of October 2026; epd.georgia.gov). Channels that hold water only after rain and streams that do not run year-round (non-perennial intermittent streams) are excluded. Whether your ditch qualifies is a question for the county's local issuing authority, not for RRE.

In South Carolina, clearing or grubbing that disturbs 1 acre or more needs coverage under the SCDES Construction General Permit before work begins. Under 1 acre, the owner files the notification form for sites disturbing less than 1 acre and receives a letter of exemption first (as of October 2026; des.sc.gov).

In the coastal counties, construction within half a mile of a receiving water body in the Coastal Zone falls under the program even under 1 acre. Coastal projects also need a Coastal Zone Consistency determination (as of October 2026; des.sc.gov). Beaufort, Charleston, Berkeley, Dorchester, and Horry counties are commonly cited as having lower local thresholds; confirm the current number with the county. Whether mulching counts as land disturbance differs by agency and county, and grubbing and grading are treated differently again. Confirm before you assume an exemption.

How does it show up on a job?

The site visit is where the water edge gets decided. The planning lead walks the bank with you, notes where the ground firms up, and flags the agreed boundary: the line the machine will not cross toward the water. Bank trees and any feature you want kept go on the keep list and get flagged. If a buffer applies, the flagged line sits outside it; the distance is yours to confirm with the agency. On the day:

  1. The operator checks the bank on foot before the machine goes near it. Soft spots found that morning move the boundary back.
  2. Mulching runs parallel to the water where the bank allows, working from the dry side toward the flagged line, so the machine never turns on the edge.
  3. Access paths are opened to the agreed width, with the mulch layer left as the surface.
  4. Stumps on the bank are left or ground only where the site visit agreed; no grubbing on a bank that holds water back.
  5. The final walk-through covers the flagged line and the bank surface with you.

Nothing is pushed into the water, and no material is hauled.

What does it mean for you?

You get a pond or creek edge you can reach and see, without the bank being cut, graded, or stripped. Mulching takes the growth off above ground and leaves the roots that hold the soil. That is also the honest limitation. Mulching does not stabilize an eroding bank, repair a dam, deepen a silted edge, or remove cattails and alligator weed growing in the water. If the bank is already failing, a pond consultant or an excavation contractor comes first, and RRE's work waits.

Buffers, permits, and wetland questions are yours. Confirm the buffer with SCDES or the Georgia local issuing authority. If any part of the edge might be a jurisdictional wetland, a wetland consultant delineates it before anyone sets a flag.

What won't RRE do near water?

Work near water RRE Who does it
Mulching brush on a dry bank to a flagged line Yes RRE
Vegetation in the water or below the waterline No Pond consultant, aquatic applicator
Dredging, deepening, or reshaping the pond No Pond consultant, excavation contractor
Dam or spillway repair, grading the bank No Excavation contractor, engineer
Wetland delineation, buffer determination, permits No Wetland consultant; SCDES or Georgia local issuing authority; landowner

Everything in the water, under the water, or in the soil itself belongs to someone else, and herbicide on bank or aquatic weeds is a licensed pesticide applicator's work.

Frequently asked questions

Will you clear right down to the waterline?

Only where the ground is firm, where no buffer applies, and where you want it. At the site visit the planning lead flags an agreed boundary on the dry bank; the machine does not cross it. On many banks that line is a few steps back from the water because the soil softens. The waterline, the bed, and anything growing in the water stay untouched.

Does Georgia's 25-foot buffer apply to my farm pond?

It depends on whether the pond or the channel feeding it counts as state waters, which the county's local issuing authority decides. As of October 2026, Georgia keeps a 25-foot undisturbed buffer along state waters under the state erosion and sedimentation ordinance. Confirm with the local issuing authority before clearing; RRE flags the boundary where you and the agency say it belongs.

Will mulching the bank cause erosion?

Mulching leaves the roots in the ground and lays a mulch layer on the surface, which is gentler on a bank than cutting or grading. It is not a stabilization method, and it will not fix a bank that is already sliding. Watch the bank after the first heavy rains, and if you see movement, call a pond consultant or excavation contractor.

Sources
  • Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance: epd.georgia.gov
  • SCDES Less than 1 Acre of Land Disturbance: des.sc.gov
  • SCDES Stormwater Construction Activities (coastal zone): des.sc.gov
  • SCDES NPDES stormwater program (Construction General Permit): des.sc.gov

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing