The questions
1. Are you insured, and can I see the certificate? Ask for a current certificate of insurance showing general liability, and workers' compensation if the contractor has employees. Ask to be named as certificate holder for the job. A contractor who hesitates here is telling you something.
2. What equipment will you bring, and what can it handle? You are listening for a straight answer about machine size, the kind of head or attachment, and the stem size it handles comfortably. Larger trees are usually felled first or kept; a contractor who says a mulching head takes everything is overselling.
3. What is your method? Forestry mulching grinds vegetation in place. Dozer clearing pushes it into piles. Hand crews cut and drag. Each has a place. The answer should match your ground, your keepers and your finish.
4. What will the ground look like when you are done? Mulch layer, bare soil, stumps flush, stumps ground below grade, stumps pulled, piles left to burn, piles hauled. Get the finish in writing with the scope.
5. How will you know which trees to keep? The answer should involve a walk, flagging tape and a written keep list before the first pass. If the contractor does not ask what you want to keep, they will decide for you.
6. Who handles permits? Ordinary clearing on private rural land in Georgia and South Carolina generally needs no state permit. Counties and coastal towns regulate protected trees, and wetlands and buffers are regulated separately. The contractor should tell you when something looks like it needs checking. Confirm with your county.
7. What does cleanup include? Hauling, burning and grading are each separate jobs, often done by separate contractors. Ask what is included, what is left on site, and who does the rest.
8. When can you start, and how long will it take? Expect a season rather than a date for a start, and a range rather than a number for duration. Production varies widely with density, stem size, terrain and access, and an honest contractor says so.
9. Can I see your work or speak to a past client? Photos of real jobs, ideally before and after on the same ground, and a reference you can contact.
RRE's answers
RRE answers each question below where the answer is confirmed. Where a detail is not yet confirmed, the line is held rather than written around.
| Question | RRE's answer |
|---|---|
| Insurance | RRE is insured. Certificates of insurance are available on request. |
| Equipment | Two high-flow Terex tracked machines with mulching heads, and a stumper for stump work. The equipment for a job is chosen at the site visit. The stem-size limit is judged there too; larger trees are kept or felled first by a logger. |
| Method | Forestry mulching: brush and small trees are cleared to open up property, improve access and make overgrown areas easier to maintain. The material is ground in place and left as a mulch layer. Selective clearing is the default. |
| Finish | The work is defined at the site visit: scope, boundaries, finish. The intended finish for each work area is written into the scope, and the job ends with a final walk-through. The mulched finish is a mulch layer over the cleared ground. Stump grinding and stump grubbing are separate services. |
| Keep list | Selective clearing starts with identifying the trees, features and areas to keep. The keep list is agreed first, flagged on the ground, and written into the scope. |
| Permits | Permits, utility locates (SC811 / Georgia 811), buffers and tree-protection compliance are the landowner's responsibility. RRE does not apply for permits on an owner's behalf, and stops work when it finds a burrow, cavity tree, grave or other protected feature. [FPO: RRE's permit policy wording for local tree ordinances — VAL-041] |
| Cleanup | Mulching leaves the material in place as a mulch layer. RRE does not haul debris and does not burn. Hauling, grading and excavation are done by other contractors. |
| Timing | Estimates are free and follow a site visit; RRE responds within one business day by email. The quote is by project, never per acre or per hour, and a 25% deposit is required to schedule. Duration is described as a partial day, one to two days, several days, or a multi-week phased project, set at the site visit. [FPO: typical lead time from site visit to start — VAL-033] |
| References | Project photos are on RRE's Facebook page. [FPO: client references and review permissions — VAL-044] |
Red flags
- No certificate of insurance, or one that is expired or names a different business.
- A price before anyone has seen the property or the photos.
- "We'll clear everything" with no question about what you want to keep.
- A promise about wetlands, buffers or protected trees with no suggestion that you check with the county.
- Burn piles proposed without mention of notification or permits.
- No written scope, no boundary walk, no finish described.
- Cash only, no paperwork.
- A claim that one machine handles every tree on the property.
Frequently asked questions
Does a land-clearing contractor need a license in Georgia or South Carolina?
Rules differ by state, county and the kind of work. Vegetation clearing is treated differently from grading, excavation or herbicide application, which have their own licensing. Ask the contractor what applies to your job and confirm with your county. RRE is insured. Certificates of insurance are available on request.
Should I get more than one estimate?
Yes, and compare the scope line by line, not just the total. Two estimates that describe different finishes are not comparable.
What should be in the written scope?
The work area, the keep list, the finish, what happens to stumps, what is and is not included in cleanup, access arrangements, and timing. If the contractor writes it, read it; if they do not, write it yourself and ask them to sign it.
Is forestry mulching always the right method?
No. It is a good fit for brush, vines, saplings and small trees where you want the ground covered and nothing hauled or burned. Larger timber, grading, and sites that need bare soil for construction call for other methods or other contractors.
Who is responsible if a protected tree is removed?
Usually the owner, sometimes the contractor, and often both. This is a question for your county and, if it matters enough, a lawyer. The safe path is to check the ordinance before the work starts.
Sources
- Owner statements on method, approach and scope. [FPO: owner confirmation + date — SRC-007]
- Protosite approach and FAQ text. [FPO: cite + access date — SRC-001]
- RRE insurance, equipment and estimate statements, approved 2026-10-15; certificates of insurance available on request.