RRE Forestry & Plantation Management

How the work happens

How RRE flags the keep list

Ribbon colors on a clearing site mean whatever was agreed for that site; there is no universal code. RRE Forestry & Plantation Management agrees the keep list with you at the site visit and flags it on the ground before the machine starts. The colors and their meanings are written into the scope, so everyone on your Georgia or South Carolina property reads the same map.

Last reviewed October 2026Reviewer: pending

What do the colors mean?

They mean what the scope says they mean. Surveyors, utility locators, loggers, foresters, and county inspectors each use their own colors, and some of those overlap or contradict each other. A pink ribbon on a surveyor's line and a pink ribbon on a logger's keep tree are not the same instruction. The only way to avoid a mistake is to agree the code for your project and write it down.

So at the site visit RRE and you settle a short list, usually three or four meanings:

  • trees and features to keep
  • the agreed boundary of the work area
  • lines or hazards to stay off
  • anything that marks a different kind of work, such as a stump to grind or a lane to open

Each meaning gets one color or one pattern. The pairing goes into the written scope, and that scope is what the operator reads on the morning of the work. If flagging already exists on your property from a surveyor or a forester, its meaning is recorded too, so nobody has to guess.

The quotable version: the ribbon is not the instruction; the scope is. The ribbon is how the scope shows up on the ground.

How is the keep list flagged?

  1. Walk it first. The keep list is built on the site visit by walking the property with you. It can include single trees, groups of trees, a fence, a well head, a grave, a creek edge, a burrow, or a view line. Selective clearing is RRE's default, so the walk spends most of its time on what stays, not on what goes.
  2. Flag it at eye level and at machine height. Ribbon goes where the operator can see it from the seat with the head up, usually chest height on the trunk or on a stake. A tree the machine will pass around gets ribbon on more than one side.
  3. Flag the edges, not just the points. A keep area, a buffer, or the agreed boundary gets a line of ribbon the operator can follow, not a single flag in the middle.
  4. Mark it on the map. The flagged items are drawn on the property map or aerial that goes with the scope. If a ribbon comes down in wind or is taken by a deer, there is a second record.
  5. Check it on the morning of the work. Before the machine moves, the operator walks the flagging against the scope. Missing or moved ribbon is replaced before any stem is cut.
  6. Leave it for the final walk-through. Ribbon stays up until you and the operator walk the finished work area together and check it against the keep list.

Where a county rule requires more than ribbon, the rule governs. Beaufort County, South Carolina, for example, requires tree protection zones around specimen and surveyed trees to be fenced before site work. The radius is one foot per inch of trunk diameter or five feet, whichever is greater (as of October 2026, beaufortcountysc.gov). Ribbon marks that zone; fencing it is yours to meet and RRE's to respect.

What does this mean for your project?

You can flag ahead of the site visit, and it helps, but it is not required and it does not replace the walk. If you do, use one color for "keep" and tell RRE what it is. Do not try to build a whole code on your own; it will be matched to the scope at the site visit anyway. If a surveyor or forester has already flagged lines on the property, leave their ribbon where it is and tell RRE who put it there.

Flagging is also where buffers become real. In Georgia, a 25-foot undisturbed buffer applies along state waters under the Erosion and Sedimentation Act (as of October 2026, epd.georgia.gov). That buffer is not visible from a machine seat. It is a flagged line on the ground, agreed at the site visit and written as part of the agreed boundary. Where a buffer or a property line is uncertain, a surveyor sets it; RRE does not determine boundaries.

What are the limits?

Ribbon is cheap, visible, and easy to lose. Wind, rain, animals, and a trailer backing past a stake can all take a flag down. That is why the map and the morning check exist.

Flagging also cannot protect what the operator cannot see from the seat. A small tree inside a wall of privet, a seedling longleaf in tall grass, or a marker stone under briars is easy to miss. If something on your keep list is hard to see, say so. It gets a tall stake, a wider ribbon line, or a hand-cleared ring at the site visit.

RRE does not publish a color code because no code holds across surveyors, foresters, utilities, and counties. The agreed scope is the code for your project.

Frequently asked questions

Can I flag the keep list myself before you come?

Yes, and it speeds up the site visit, but it does not replace it. Use one color for everything you want kept, tell RRE what the color is, and leave any surveyor's or forester's ribbon where it is. At the site visit the flagging is walked, matched to the scope, and added to as needed. Anything you flagged that the machine cannot work around safely is discussed before it is written in.

What happens if a ribbon falls down before the work?

The flagged items are also drawn on the property map that goes with the scope. On the morning of the work, before the machine moves, the operator walks the flagging against that map. Missing or moved ribbon is replaced from the map. If a flagged tree is cut anyway, that is RRE's responsibility under the written scope, not yours.

Do you use the same colors as surveyors and utility locators?

No single code covers everyone. Surveyors, utility locators, loggers, foresters, and county inspectors each use their own colors, and they overlap. RRE records what any existing ribbon means and agrees a separate, written code for the keep list on your project. The scope says what each color means; the ribbon only shows where.

Does flagging a tree protect its roots?

Ribbon on the trunk tells the operator to keep the tree. Whether the roots are protected depends on how far the machine stays back and whether the county requires a fenced protection zone, as Beaufort County does for specimen trees. Root protection is discussed at the site visit and may mean a flagged circle at a set distance rather than a single ribbon on the trunk.

Sources
  • Beaufort County, SC, tree protection ordinance (tree surveys, protection zone radius, fencing before site work): beaufortcountysc.gov
  • Georgia EPD Model Soil Erosion, Sedimentation and Pollution Control Ordinance (25-foot buffer along state waters): epd.georgia.gov

Start a conversation

Tell us about your property.

Estimates are free and follow a site visit. We quote the whole project, never by the acre or the hour, and we reply within one business day by email.

  • Town or county and rough acreage
  • What to clear, keep, or improve
  • Photos of the area and the way in
  • Your timing