Before: hazard reduction, lanes and pond edges
Hurricane season runs June through November, and the Lowcountry and coastal South Georgia sit in the path. The work worth doing before it starts is simple.
- Hazards near the house, barn and drive. Dead, leaning and crowded small trees and heavy brush close to structures are the first things down in a wind. Mulching them out ahead of time reduces the risk and leaves nothing to pick up. Mature trees you want to keep stay.
- Lanes and the way out. An overgrown lane is one a single downed limb closes. Keep the drive, the farm road and the route to the gate cleared to a usable width. Then a saw reopens it after the storm, not a machine.
- Pond and ditch edges. Brush choking a pond edge or a drainage ditch catches storm debris and holds water where you do not want it. Clearing the edge keeps it visible and reachable.
The full list is in the storm season checklist for rural property.
After: access first, then mulching
The first need after a storm is nearly always the same: you cannot get down your own lane. So the order of work is fixed.
- Access. The drive, the lane to the house, the route to the barn or the well. Downed brush and small trees are mulched where they lie so a vehicle can pass.
- Structures and routes. Downed material against fences, outbuildings and the pond edge, once a person can safely reach them.
- The rest. Blown-down brush and small trees across the property, mulched in place. The mulch layer covers the churned ground and slows erosion before the next rain.
Mulching is best on brush, vines and small trees. Large downed trunks are a different job: cut and left, cut for firewood, or removed by a tree service or hauling contractor. Read hurricane vegetation cleanup: what mulching can and can't do so you know which parts of the mess are ours.
What RRE does not do
- Haul. The material is ground and left on the ground. No dump trailers, no trips to the landfill. A hauling contractor removes debris from the property.
- Structural debris. Roofing, siding, fencing, metal, docks and anything that was part of a building is not vegetation. That is a demolition or disaster-cleanup contractor's work.
- Trees on houses. A tree on a roof is a job for a tree service with a crane, not a mulching machine.
- Grading or ditching. Washed-out drives and blocked ditches need an excavation contractor.
Scheduling and priority
After a hurricane every clearing contractor in the region is busy at once, and we will not pretend otherwise. We respond within one business day by email, and the scope and timing are confirmed at a site visit. [FPO: travel rules after a storm, including which counties RRE reaches first — VAL-039]
The better plan is to do the preparation work before June, when the schedule is open and the ground is dry. A property with its lanes clear and its hazards down is in a far better position after the storm.
Get ahead of the season
Write to hello@rreforestry.com with the county, the acreage, photos of your lanes and the brush near your buildings, and whether this is before or after a storm. Request a consultation.
Frequently asked questions
Can you come the day after the storm?
Not usually, and we will not promise it. Roads are closed, ground is saturated, and every call is urgent. Write to us with photos and your location; we respond within one business day by email and will give you an honest place in the schedule.
Can you work on wet ground after a storm?
Carefully, and not everywhere. Saturated ground ruts and slides under a machine. Access lanes come first because they matter most; the wider cleanup waits for the ground to firm up.
Will insurance cover the clearing?
Ask your insurer; policies differ and we cannot advise on them. Photograph the damage before any clearing starts, and ask us for the agreed scope in writing.